Wood floor installation requires a level subfloor and that your hardwood flooring is acclimated to the room s humidity and temperature according to the manufacturer s guidelines.
Easy way of putting wood floor down.
Maintenance is easy for a pre finished hardwood floor keep grit off of the surface by sweeping regularly and use a flooring cleaning kit alcohol based and spray on and wipe off with a damp cloth.
Used when installing solid hardwood nail down installation is chosen due to how quickly and cost effectively it can be done.
When you finish the first row fit the tongue into the grooves of the boards in the next row and use a mallet to tap them together tightly.
Align the first board with the layout line with the tongue facing into the room.
The challenge when.
Then using the hammer and block of wood tap on the shorter end of the laminate plank to connect firmly at the heel of the board to the head of the one there.
Take a new piece of laminate and go to the second row.
Methods of installing hardwood flooring.
Nailing works best with thin wood flooring.
Here s how to install flooring using the nail down method.
To install hardwood flooring start by laying the first boards against the wall then nailing them down to the subfloor by placing a nail every 6 inches.
Flooring specialists use a routine procedure for nailing all boards in an installation except for those in the first and last rows.
To learn how to do this watch prepping plywood subfloors.
While personal preference is a factor the direction in which you run hardwood flooring boards is governed by visual and structural guidelines.
If you re installing over concrete you ll need to drill pilot holes through the wood and into the concrete to set the nails.
The correct direction for laying hardwood floors.
There are four ways to attach and install your hardwood floors.
First set it lengthwise alongside the last board and snap the pieces together.
Cutting the last row of hardwood flooring.
Hardwood floors also help cut down on dust mites.